Inspection documentation

Define the records that connect drawing requirements, inspection and receiving.

Connect the delivered part to its records
Connect the delivered part to its records

Link part identity, drawing revision and measured features in the agreed documentation.

Part identityDrawing revisionFeature records
PROCESS · PARTS · PROJECT DETAILS

Records that follow the part

Define the document fields and inspection scope before production.

01

Drawing reference

Identify the part number, revision and feature number so the reader can find the corresponding requirement.

02

Measurement context

Record instrument or method and any relevant support or final-finish condition.

03

Batch link

Connect the record to the inspected sample, delivery batch and review status.

Project reference

IdentityPart number, drawing revision, inspected sample and batch.
Inspection recordFeature, requirement, method, measured result, disposition, date and reviewer.
Document scopeAgree the report format and inspection scope before production.

Inspection documentation

Dimensional records

Drawing features, requirements and agreed measurements.

Material documentation

Grade and documentation requirements agreed with the order.

First-piece requirements

Confirm the features and records needed before production.

Inspection scope and documentation are agreed before production.

Include Inspection Requirements in Your RFQ

Agree the delivery document set

Specify what is required rather than assuming every record is automatic.

Record typeUseful contentsInput needed
Dimensional recordFeature reference, requirement, measurement result and agreed inspection condition.Approved drawing and critical-feature list.
First-piece recordPart/revision, first-piece quantity, checked features and approval reference.First-piece scope and approval responsibilities.
Material documentationRequired grade/condition and the material documents agreed with the order.Material specification and documentation requirement.
Finish / appearance referenceSpecified process, accepted sample/reference and protected functional areas.Cosmetic faces, masking and acceptance reference.
Batch / delivery identityDelivered part/revision, quantity and package identification.Delivery split and receiving labels.
REPORT CONTENT

From a drawing feature to a recorded result

Agree these fields before production. This is a report structure, not a completed measurement report.

Part identity

Part number, drawing revision, material, finish and batch.

Inspection basis

Feature ID, datum, unit, lower and upper limits.

Measurement record

Sample ID, instrument, method, actual value and result.

Review and disposition

Inspector and reviewer dates; deviation and disposition reference.

A dimensional result does not replace drawing revision, traceability or review. Sampling and acceptance follow the project agreement.

Keep records aligned with the delivered batch

A useful document set remains identifiable after receiving.

Can a customer format be used?

Provide the template and required feature numbering before production for review.

How are changed revisions handled?

Identify the applicable revision and batch, then agree which affected features require updated records.

Can customer drawings be published as samples?

Project documents are handled through the agreed exchange process. This page presents field structures rather than customer drawing or measured-result files.