From drawing requirements
to inspection records

Connect datums, mating features and surface requirements with first-piece, in-process and final inspection.

Inspection room with coordinate and dimensional measurement equipment
Inspection room with coordinate and dimensional measurement equipment
INSPECTION THROUGH PRODUCTION

Keep the part and its records connected

Agree the features, methods and inspection records before production.

  1. 01

    First-piece confirmation

    Confirm the drawing revision, material identification, datum setup and critical features against the agreed inspection plan.

  2. 02

    In-process checks

    Check specified features at the agreed production stages and review changes in setup or part condition.

  3. 03

    Final inspection & handover

    Check the final dimensions, surface and edge condition, then connect results with part identification and delivery records.

Match the check to the feature

Choose a feature to see the inspection approach. The final method and sampling scope are confirmed for your drawing.

01Hole positions & datums
ACONCEPT ILLUSTRATION · NOT A PART DRAWING

Do the locating features share the drawing references?

Inspection approach
CMM, vision measurement or dimensional gauges, selected for the drawing feature.
Check focus
Agree the datum references, hole sizes and position requirements.
Records
Drawing feature references and agreed dimensional records.
02Profiles, slots & thin walls
CONCEPT ILLUSTRATION · NOT A PART DRAWING

Does the measured shape reflect the intended part condition?

Inspection approach
Vision measurement and dimensional tools, with support conditions reviewed for thin walls.
Check focus
Agree measurement locations, slot layout and edge conditions.
Records
Profile or size records and the agreed inspection condition.
03Threads & mating interfaces
CONCEPT ILLUSTRATION · NOT A PART DRAWING

Are the thread specification and mating condition correct?

Inspection approach
Thread gauges and dimensional checks appropriate to the specified interface.
Check focus
Confirm thread type, gauge requirements and cleanliness at the interface.
Records
Thread specification and agreed gauge-check results.
04Surface texture & edges
CONCEPT ILLUSTRATION · NOT A PART DRAWING

Does the finished surface match the agreed condition?

Inspection approach
Surface roughness measurement where specified, plus visual checks for edges and appearance.
Check focus
Identify measured areas, cosmetic references and burr-removal requirements.
Records
Agreed roughness readings and appearance or edge-check records.
INSPECTION EQUIPMENT

Different checks with a clear purpose

Select measurement or testing around the drawing, part condition and project requirements.

Coordinate measurement
Coordinate measurement

Coordinate measurement

Plan datums, probe access and part support for spatial dimensions and feature relationships.

Microscopic inspection
Microscopic inspection

Microscopic inspection

Examine small surface details, edges and local features at an appropriate magnification.

Salt spray testing
Salt spray testing

Salt spray testing

Agree sample condition, test conditions, duration and acceptance requirements for the project.

Temperature & humidity testing
Temperature & humidity testing

Temperature & humidity testing

Agree environmental conditions, exposure duration and the checks required after testing.

From a measured feature to a traceable record

Connect the part number, drawing revision, sample, instrument, measured result and review. Report content and sampling follow the project agreement.