Inspection planning

Agree the features, stages and approval points before manufacturing.

Define which features will be checked
Define which features will be checked

Connect the bore, slots and end features with the agreed inspection stage and method.

Bores & fitsSlots & openingsEnd features
PROCESS · PARTS · PROJECT DETAILS

Plan inspection around manufacturing risk

Inspection stages should follow where a feature is created, where it can change and when it is still accessible.

Company sample · structure reference
Company sample · structure reference
01

Incoming & setup

Check material identity, stock condition and the released drawing before production starts.

02

First-piece & in-process

Review the first piece before repeating the operation. Recheck critical features after operations that may affect them.

03

Final & packing

Complete the agreed final checks after finishing, then match the records, quantity and protective packaging.

Project reference

Illustrative inspection planFirst piece: selected critical features; batch: agreed sampling; final: appearance and identification.
Sampling scopeInspection frequency is agreed per order and risk; full dimensional inspection must be specified separately.
ENGINEERING GUIDE

Agree the inspection plan before production

Start with the drawing feature, then define the method and the point at which it is checked.

Plan inspection around the mounting features
Plan inspection around the mounting features
FEATURE REVIEW

Plan inspection around the mounting features

For this supplied sample, the bore, faces and hole locations provide a practical way to discuss which features need measurement and at what stage.

  • Bore and mating relationship
  • Face and datum references
  • Hole locations and inspection stage
Inspection stageFocusWhat to agree
Incoming / preparationMaterial identity, drawing revision and inspection inputs.Material documents, stock condition and applicable specifications.
First-piece inspectionKey features before the following quantity is released.Feature list, measurement condition and approval responsibilities.
In-process inspectionDimensions or interfaces that may be affected by later operations.Check frequency, inspection access and record requirements.
Final-condition inspectionDimensions, threads, surface condition and identification after the specified route.Post-finish dimensions, cosmetic references and release criteria.

Inspection in the manufacturing workflow

01

Drawing review

Material, revision and critical features.

Drawing requirements
02

First-piece checks

Agreed features before repeat machining.

First-piece features
03

In-process checks

Key dimensions during machining.

Process records
04

Final inspection

Dimensions, interfaces and appearance.

Acceptance state
05

Packing & dispatch

Identification and protective packaging.

Identity & protection

Approval points in the inspection plan

Make the owner, information and decision clear at each stage.

StageInputs for reviewDecision to agree
Before productionApproved drawing/model revision, material and critical-feature list.Inspection scope, measurement condition and required records.
First-piece approvalAgreed feature checks and any open drawing questions.Whether the following quantity can proceed and who confirms it.
After specified finishingFinal fits, masking requirements and accepted appearance reference.Features requiring recheck in the finished condition.
Before dispatchAccepted quantity, part identification and agreed quality records.Release scope, packing protection and delivery split.
ENGINEERING GUIDE

When a requirement needs clarification

A changed drawing or a questionable result needs an agreed disposition.

  1. 01

    Identify and separate

    Identify the part, revision, batch and affected feature so it is not confused with accepted work.

  2. 02

    Review against the requirement

    Review the drawing, measurement references and inspection condition before deciding the next action.

  3. 03

    Confirm the disposition

    Any proposed rework, acceptance change or drawing revision needs agreement and corresponding record updates.

Planning questions

The plan follows the actual order requirements.

Are all features checked on every part?

Inspection frequency is agreed per feature and order. Identify full-inspection requirements separately from sampling.

When should inspection records be specified?

State the format, feature numbering and approval requirements before production so the records can be planned with the route.

Does a changed drawing change the inspection plan?

Review the changed features, datums, methods and affected batches before releasing the new revision.